Also concrete slab should be constructed with the appropriate moisture barricade.
Engineered floor glue concrete.
Then the engineered wood planks can be laid into the adhesive and locked together at their tongue and groove joints.
When working on a clean concrete subfloor the glue down method is often the go to choice.
Roller to make sure that the adhesive fully transfers to the engineered wood floor and the concrete.
Roberts 1407 is recommended for the installation of engineered wood flooring up 1 2 thick amp.
The adhesive manufacturer should have instructions regarding specific trowel requirements.
Glue down hardwood floors on concrete the installation of hardwood floors by the glue down method is used predominately on concrete slabs.
Applications are more prominent with residential construction in sunbelt areas commercial locations and high rise dwellings.
Boards adhere well to the rough surface of the concrete subfloor and therefore lead to less gaps or planks lifting and buckling.
How are they installed.
Foot traffic should be restricted on the newly installed floor for 16 24 hours.
A glue down installation requires premium wood adhesives be properly troweled over the concrete slab and the engineered wood planks laid onto the adhesive and locked together at their tongue and groove joints.
Wide over concrete slab provided moisture readings in the slab are within tolerances of the adhesive and wood floor manufacturer.
Thank you for your inquiry.
Once you have finished installing your engineered wood use a 100 150 lb.